By Paul Griffith · July 3, 2026

How long does commercial video production take?

Let’s be clear: Griffith Media can move fast. We often get a call on a Tuesday asking for a deliverable by Friday, and we can usually make it work. The team is agile, supports each other well, and can build multiple elements at once. But just because we can turn it fast doesn’t mean it’s wise. Quick turns mean less client input on revisions, and less pre-production and creative development to make the work really shine.

A clapperboard is held up in front of two performers in trench coats on a set lit with blue LED panels and overhead boom microphones

Let’s talk best practice.

A simple commercial can often move from approved brief to delivery in three to five weeks. A typical production may need six to eight weeks. A more complex campaign with casting, several locations, art direction, legal review, visual effects, or many versions can take ten to twelve weeks or longer.

The clock should start when the brief is approved and the decision-makers are available.

An idea can arrive on Monday. That does not mean the project is ready to shoot on Friday.

The schedule has to make room for the parts the audience never sees: scripts, casting, locations, insurance, schedules, wardrobe, art, music, approvals, edit rounds, color, sound, and final versions.

The three phases of a commercial timeline

Phase 1: Creative and pre-production

This is where the team turns a business need into a production plan.

It may include:

  • discovery and brief
  • concept development
  • treatment
  • script
  • storyboard or shot list
  • visual references
  • casting
  • location search and scouting
  • art, wardrobe, and props
  • crew and equipment plan
  • schedule and call sheet
  • permits, releases, and insurance
  • client, legal, or compliance approval

A simple interview-led commercial may move through this phase quickly. A scripted spot with talent and several scenes needs more time because every creative choice creates a production decision.

Pre-production is where a project becomes cheaper, safer, and easier to shoot.

Phase 2: Production

Production may be one day or several.

The schedule includes more than the hours when the camera is recording. It also includes:

  • load-in
  • set build or dressing
  • lighting and camera prep
  • sound checks
  • hair, makeup, and wardrobe
  • rehearsals
  • company moves
  • meal breaks
  • media backup
  • strike and load-out

A 30-second spot can take a full day because every shot is designed, lit, performed, and repeated until the team has what it needs.

Phase 3: Post-production and delivery

Post may include:

  • footage organization
  • first assembly
  • editorial revisions
  • motion graphics
  • visual effects
  • color
  • sound design and mix
  • voiceover
  • music and licensing
  • captions
  • legal or claim review
  • horizontal, vertical, square, and cutdown versions
  • final quality control

The number of stakeholders and versions can affect the post schedule as much as the complexity of the edit.

Three useful planning windows

Three to five weeks: simple and focused

This may fit a project with:

  • one clear concept
  • one location
  • a small cast or real employees
  • a limited number of final versions
  • quick client approvals
  • light graphics
  • no complicated legal, union, or visual-effects needs

This schedule still requires decisions to move. A short calendar does not leave room for several days of internal debate between every milestone.

Six to eight weeks: a typical commercial rhythm

This is a healthier range for many polished brand and commercial projects.

It gives room for:

  • concept development
  • script revisions
  • casting or participant coordination
  • location and production planning
  • one or two shoot days
  • organized review rounds
  • final color, sound, and versions

The work can breathe without sitting still.

Ten to twelve weeks or more: complex campaign work

This range may be needed for:

  • several concepts or deliverable families
  • multiple shoot days
  • several locations
  • travel
  • professional casting
  • substantial art direction
  • original music
  • visual effects or animation
  • union requirements
  • legal or regulatory review
  • many markets, languages, or platform versions

Large campaigns often have parallel tracks. Casting, locations, art, and post planning may move at the same time, but they still need decisions in the right order.

A sample six-week schedule

This is a starting point. The scope will change it.

Week 1: Brief and creative direction

  • kickoff
  • audience and objective
  • references
  • concept development
  • treatment review

Client decision: Approve one direction.

Week 2: Script and production plan

  • script
  • shot approach
  • casting brief
  • location options
  • budget confirmation

Client decision: Approve script and major production choices.

Week 3: Final pre-production

  • casting and location lock
  • art, wardrobe, props
  • schedule and call sheet
  • technical plan
  • legal and claim check
  • pre-production meeting

Client decision: Approve final production plan.

Week 4: Shoot

  • production
  • media backup
  • edit preparation

Week 5: First cut and revisions

  • first cut
  • consolidated client notes
  • revised cut
  • graphics, music, and finish development

Client decision: Approve picture and core message.

Week 6: Finish and delivery

  • final color
  • sound mix
  • captions
  • platform versions
  • quality control
  • delivery

This schedule works when feedback arrives on time and one person owns the final set of notes.

What usually slows the timeline

The brief keeps changing

When the audience, offer, message, or call to action moves, the script and creative direction move with it.

Too many concepts stay alive

Exploring several directions can be useful early. Production cannot plan three different commercials indefinitely. One direction needs to win.

Casting starts late

The right person may need auditions, callbacks, availability checks, contracts, wardrobe, and travel.

The location is treated as a last-minute detail

Locations affect sound, lighting, power, access, parking, permits, weather, art, and schedule.

Claims and legal language arrive after the shoot

A sentence that must be worded precisely should be approved before it is performed. Fixing it later may require a pickup, voiceover, new graphics, or a re-edit.

Feedback comes in pieces

An editor can address one consolidated round. A week of separate notes from five stakeholders keeps reopening the same cut.

Every platform asks for a different piece

A 30-second broadcast spot, six-second bumper, vertical social ad, silent display loop, and organic cutdown can share footage. They still need individual edits and checks.

How to move faster without creating chaos

Approve the brief first

Lock the audience, goal, offer, message, call to action, budget, and required date before developing several ideas.

Put the real decision-makers in early reviews

A late executive opinion can reset weeks of work. Bring the people with final authority into the treatment and script stages.

Use one feedback owner

That person gathers internal notes, resolves conflicts, and sends one clear response.

Pre-approve what can be pre-approved

Brand fonts, logos, disclaimers, claim language, music direction, end cards, and platform specifications can be settled before post.

Simplify geography

One strong location can save travel and reset time. A studio may help when control matters more than showing a real place.

Plan versions before the shoot

Vertical composition, short hooks, alternate calls to action, and clean plates are much easier to capture on purpose than to invent later.

What a rush schedule really changes

A rush production can work when the concept is focused and the team has immediate access to decisions, people, locations, and budget.

It may require:

  • added producer time
  • faster client approvals
  • parallel pre-production
  • pre-approved templates
  • editors working in shifts
  • overtime
  • simplified creative choices
  • fewer versions
  • a backup plan for every critical dependency

The deadline should shape the scope. A compressed schedule with every feature of a long schedule usually creates cost and risk.

Ask the production company which part of the plan must change to protect the delivery date.

A timeline checklist

Before approving the schedule, confirm:

  • the brief is approved
  • the budget is available
  • decision-makers are identified
  • scripts and claims have a review path
  • talent and executives have real availability
  • location access is possible
  • the shoot date is held
  • feedback deadlines are on calendars
  • legal or compliance review is scheduled
  • final platform specifications are known
  • rush fees or overtime assumptions are clear
  • the launch date includes time for client upload and trafficking

What this means for your commercial

A realistic timeline protects the creative idea.

It gives the team enough time to solve the story before production, capture it well on the day, and finish the work without treating every review as an emergency.

Start with the date the commercial must be live. Work backward through delivery, approvals, post, production, and pre-production. Then make sure the people who need to decide are available at each step.